
The new hydrotherapy pool in Tuggeranong will be open to the public from August 25.
The government said the new facility – located at the Lakeside Leisure Centre – complemented the hydrotherapy pool at the University of Canberra Hospital.
The new pool would support people living with chronic conditions such as arthritis, cancer and migraines, and those recovering from injury or surgery.
The hydrotherapy pool had been designed in line with the Australasian Health Facilities Guidelines to ensure accessibility, safety and comfort for all users. Key features included:
- Additional accessible and standard parking spaces.
- Ramps to access the centre and the pool.
- Underfloor heating and water temperature at 33-34 degrees (about the same as skin temperature – which means the body does not go into any shock when entering the water and enables the muscles and nervous system to relax).
- Accessible bathroom and change room.
- Safety and accessibility support features such as handrails, bariatric rated hydraulic hoist to access the pool and slip-resistant flooring.
- Storage for mobility aids including wheelchairs and mobility scooters.
The facility also included a Changing Places facility, a specialised accessible public toilet for people with disability who have high physical support needs.
The new hydrotherapy pool would be managed by Belgravia as part of the Lakeside Leisure Centre. Booking could be made through the Active World app or in person at reception.
Leave a Reply